Documents Cited - GPO Appendices

Details File

Abrahamson, N.A. and Silva, W.J., 1997, Empirical response spectral attenuation relations for shallow crustal earthquakes: Seismological Research Letters, v. 68, p. 94-127.

View Details PDF icon Download PDF

Abrahamson, N.A. and Silva, W.J., 2008, Summary of the Abrahamson and Silva NGA ground motion relations. Earthquake Spectra, v. 24, p. 67-97.

View Details PDF icon Download PDF

Ahonen, L. and Tuovinen, O.H. 1990. Kinetics of sulfur oxidation at suboptimal temperature. Applied and Environmental Microbiology, v. 56, p. 560-562

View Details PDF icon Download PDF

Akciz, S.O., Grant Ludwig, L., Arrowsmith, J R., and Zielke, O., 2010, Century-long average time intervals between earthquake ruptures of the San Andreas fault in the Carrizo Plain, California: Geology, v. 38, p. 787-790.

View Details PDF icon Download PDF

Aki, K., 1983, Seismological evidence in support of the existence of “Characteristic Earthquakes”: Earthquake Notes, v. 54, p. 60-61.

View Details PDF icon Download PDF

ALS (2014) Pilot Plant Test Work, Resolution Copper Project, Rio Tinto. Report KM4420, December 19, 2014.

View Details PDF icon Download PDF

American Society of Testing and Materials (ASTM) D5744-96, 1996. Standard Test Method for Accelerated Weathering of Solid Materials Using a Modified Humidity Cell. ASTM International, West Conshohocken, PA.

View Details PDF icon Download PDF

AMIRA. 2002. ARD Test Handbook. Project P387A. Prediction and Kinetic Control of Acid Mine Drainage, AMIRA International Limited, Melbourne, Australia.

View Details

Anderson, J.G., 1979, Estimating the seismicity from geological structure for seismic risk studies: Bulletin of the Seismological Society of America, v. 69, p. 135-158.

View Details PDF icon Download PDF

Anderson, L.W., Piety, L.A., and Hansen, R.A., 1986, Seismotectonic investigations, Stewart Mountain Dam, Salt River Project, Arizona: U. S. Bureau of Reclamation Seismotectonic Report 86-2, 41 p.

View Details PDF icon Download PDF

Arizona Department of Environmental Quality (ADEQ). 2004. Arizona Mining Guidance Manual BADCT, Aquifer Protection Program. Publication TB 04-01.

View Details PDF icon Download PDF

EIS Status Update - Mar 2019

As of March 15, a Draft EIS update is now available under the ‘Public Involvement’ tab. To view the update, click here.

View EIS Status Update

EIS Status - Feb 2019

  1. Proponent submits revised Plan of Operations [Sep 2014]
  2. Federal Register Notice of Intent to prepare EIS [Mar 2016]
  3. Public scoping period and scoping meetings
    [5 meetings between Mar-Jun 2016; comment period extended from 60 days to 120 days, closed Jul 18, 2016 ]
  4. Compile and review existing data
  5. Prepare project description and identify project alternatives
  6. Publish Alternatives Evaluation Report [Sep 2017]
  7. We Are Here
    Validate Baseline Information; analyze environmental effects
  8. Prepare Draft EIS
  9. Federal Register Notice of Availability of Draft EIS
  10. 90-day public review and comment period, with public meetings
  11. Respond to public comments and prepare Final EIS
  12. Federal Register Notice of Availability of Final EIS and Draft ROD
  13. 45-day Public Objection Period
  14. Resolve objections to Final EIS and draft ROD
  15. Issue Final Record of Decision

[ View Larger Version ]

Forest Points of Contact

Media & General Info
John Scaggs
jscaggs@fs.fed.us

Project Manager
Resolution Copper
Mary Rasmussen
mcrasmussen@fs.fed.us

Apache Leap Special Management Area
Apache Leap SMA website