Documents Cited - GPO Appendices

Details File

Felzer, K.R., 2008, Calculating California seismicity rates, Appendix I in the Uniform California Earthquake Rupture Forecast, version 2: U.S. Geological Survey Open-File Report 2007- 1437I.

View Details PDF icon Download PDF

Ferguson, C.A. and Skotnicki, S.J., 1995, Geology of the Florence Junction and southern portion of the Weavers Needle 7.5' Quadrangles, Pinal County, Arizona: Arizona Geological Survey Open-File Report 95-10, includes 1:24,000 scale geologic map, cross-sections, 27 p.

View Details PDF icon Download PDF

Flood Control District of Maricopa County (FCD). 2011. Drainage Design Manual for Maricopa County; Hydrology. February 2011.

View Details PDF icon Download PDF

Frankel, A., 1995, Mapping seismic hazard in the central and eastern United States: Seismological Research Letters, v. 66, p. 8-21.

View Details PDF icon Download PDF

EIS Status Update - Mar 2019

As of March 15, a Draft EIS update is now available under the ‘Public Involvement’ tab. To view the update, click here.

EIS Timeline - Feb 2019

  1. Proponent submits revised Plan of Operations [Sep 2014]
  2. Federal Register Notice of Intent to prepare EIS [Mar 2016]
  3. Public scoping period and scoping meetings
    [5 meetings between Mar-Jun 2016; comment period extended from 60 days to 120 days, closed Jul 18, 2016 ]
  4. Compile and review existing data
  5. Prepare project description and identify project alternatives
  6. Publish Alternatives Evaluation Report [Sep 2017]
  7. We Are Here
    Validate Baseline Information; analyze environmental effects
  8. Prepare Draft EIS
  9. Federal Register Notice of Availability of Draft EIS
  10. 90-day public review and comment period, with public meetings
  11. Respond to public comments and prepare Final EIS
  12. Federal Register Notice of Availability of Final EIS and Draft ROD
  13. 45-day Public Objection Period
  14. Resolve objections to Final EIS and draft ROD
  15. Issue Final Record of Decision

[ View Larger Version ]

Forest Points of Contact

Media & General Info
John Scaggs
jscaggs@fs.fed.us

Project Manager
Resolution Copper
Mary Rasmussen
mcrasmussen@fs.fed.us

Apache Leap Special Management Area
Apache Leap SMA website