AMEC Foster Wheeler

This report deals with the potential impacts of noise and vibration on the Apache Leap Special Management Area (SMA) due to the construction and operation of the proposed underground inclined conveyor system for the Resolution Copper facility.

This Tailings Corridor Pipeline Management Plan outlines the design considerations and environmental and spill control measures for pipeline construction and operation.

Media Point of Contact

Susan Blake
susan.blake@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website