Bill Victor

This draft technical memorandum has been prepared to summarize results of drilling, construction, and development of groundwater production well RESPW-01. The well was installed to intersect mine workings on the 4400 Mine Level adjacent to Shaft No. 8 of the Magma Mine in order to dewater that level and overlying levels.

Media Point of Contact

Susan Blake
susan.blake@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website