Earth Systems was engaged to conduct kinetic geochemical testwork on tailings samples generated from pilot scale metallurgical testwork for the Resolution Copper Mine.
A probabilistic seismic hazard analysis (PSHA) and deterministic seismic hazard analysis (DSHA) were performed for Resolution Copper’s Mine site including the area above the deposit (Mine area) and the area covering the East Plant site (Shafts 9/10).
This modeling plan includes a description of the methods and data sets that are planned to be used in the air quality modeling analyses to estimate the Resolution Project’s air quality impacts relative to the applicable Ambient Air Quality Standards (AAQS) for criteria pollutants and to Air Quality Related Values (AQRV) in the near-field domain.
This list contains assessment units that were assessed as impaired (Category 5) by ADEQ or EPA during the current and previous assessment listing cycles.
In 2016–2017, Arizona State University conducted a study to measure the economic impact of OHV recreation, by retained and out of state visitors, on the State of Arizona.
Materials that meet the criteria of Freedom of Information Act exemptions are not posted on this website. Culturally sensitive materials not posted here fall under this criteria.
The proposed project would not result in significant habitat alteration, effects outside the project area, cumulative effects on listed species or habitat, or cumulative effects on sensitive species or habitat.
Guidance for Federal departments and agencies on establishing, implementing, and monitoring mitigation commitments identified and analyzed in Environmental Assessments, Environmental Impact Statements, and adopted in the final decision documents.