M3 Engineering & Technology

This Pipeline Protection Plan provides a summary of engineering efforts to protect the pipelines within the corridor from potential failure.

As such, the mine outdoor lighting design was prepared in accordance with Lighting Zone 3 and the results are discussed below.

Comments from each of the six public hearings are available for viewing. Note that the public comment period is now closed.

Public Hearing Comments

Draft EIS

The draft EIS public comment period closed November 7, 2019. All 30,000+ comment submittals are now under review for consideration in the compilation of the final EIS.

Media & General Info

Point of Contact
John Scaggs
Tonto National Forest
john.scaggs@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website