MWH Global

A geochemical characterization was completed as part of the Pre-Feasibility Study for Resolution Copper Mining, LLC.

This data summary report summarizes laboratory testing procedures and test results that were completed on concentrate produced during mineral processing, feedstock material, and metallurgical testing (rougher, cleaner, and whole) tailings produced from the lock cycle float tests.

Comments from each of the six public hearings are available for viewing. Note that the public comment period is now closed.

Public Hearing Comments

Draft EIS

The draft EIS public comment period closed November 7, 2019. All 30,000+ comment submittals are now under review for consideration in the compilation of the final EIS.

Media & General Info

Point of Contact
John Scaggs
Tonto National Forest
john.scaggs@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website