Summary

During the Water Working Group Meeting held on June 25, 2020, there was a request for more details about how nitrogen (N) chemical loads and concentrations were estimated in the block cave geochemistry and tailings solute models. The purpose of this memo is to provide these details and to serve as clarification to action item WR-20.

Cited In
Reference Information

Eary, T. 2020. Nitrogen Chemical Loads and Concentrations in the Geochemical Models used for the Resolution Copper Project. Technical memorandum. Loveland, Colorado: Enchemica, LLC. July 8.