Date Published
July 8, 2020
Summary
During the Water Working Group Meeting held on June 25, 2020, there was a request for more details about how nitrogen (N) chemical loads and concentrations were estimated in the block cave geochemistry and tailings solute models. The purpose of this memo is to provide these details and to serve as clarification to action item WR-20.
Cited In
Reference Information
Eary, T. 2020. Nitrogen Chemical Loads and Concentrations in the Geochemical Models used for the Resolution Copper Project. Technical memorandum. Loveland, Colorado: Enchemica, LLC. July 8.
*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.