Rio Tinto is evaluating the Resolution Copper deposit located in Arizona. The main interest for this project is copper, with a secondary value in molybdenum. The principle objectives of this project were to:

  • Construct a composite and assess the chemical and mineralogical characteristics of the sample.
  • Conduct limited metallurgical laboratory test work to confirm the performance for two flowsheets, namely a bulk circuit and selective circuit.
  • Prepare pilot plant feed material, and operate a pilot plant to evaluate continuous metallurgical performance of both flowsheets.
  • Produce pilot plant bulk concentrates for subsequent copper-molybdenum separation testing.
  • Produce pilot plant flotation products for testing by other vendors.
  • Produce pilot plant products for environmental testing.