John Malusa

This Technical Memorandum presents the first update of the Groundwater Assessment prepared by Golder Associates Inc. (Golder) on behalf of Resolution Copper Mining Company LLC (RCML). This work is required as part of the Area-Wide Aquifer Protection Permit (APP) No. P101703, for the West Plant Site (Figure 1). Specifically, this Technical Memorandum partially fulfills APP Compliance Schedule Item (CSI) No. 2.

This tech memo presents the first update of the Groundwater Assessment prepared by Golder Associates on behalf of Resolution Copper Mining.  This work is required as part of the Area-Wide Aquifer Protection Permit for the West Plant Site.  Specifically, this tech memo partially fulfills APP Compliance Schedule Item (CSI) No. 2.

Comments from each of the six public hearings are available for viewing. Note that the public comment period is now closed.

Public Hearing Comments

Draft EIS

The draft EIS public comment period closed November 7, 2019. All 30,000+ comment submittals are now under review for consideration in the compilation of the final EIS.

Media & General Info

Point of Contact
John Scaggs
Tonto National Forest
john.scaggs@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website