Traffic

The purpose of this traffic study is to evaluate the current and future transportation system at the proposed Resolution Copper Mine expansion without and with the project. Traffic operations were analyzed at existing, key intersections located near the proposed mining operations and facilities during construction and final operations. Revised April 13, 2017.

The purpose of this traffic study is to evaluate the current and future transportation system at the proposed Resolution Copper Mine expansion without and with the project. Traffic operations were analyzed at existing, key intersections located near the proposed mining operations and facilities during construction and final operations.

Comments from each of the six public hearings are available for viewing. Note that the public comment period is now closed.

Public Hearing Comments

Draft EIS

The draft EIS public comment period closed November 7, 2019. All 30,000+ comment submittals are now under review for consideration in the compilation of the final EIS.

Media & General Info

Point of Contact
John Scaggs
Tonto National Forest
john.scaggs@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website