Thumbnail image of document cover: Final Report Describing Flotation Testing on Master Cumpusile No. 1 (RES 2C-2, 3-1 and 3A-1) from the Resolution Project

Final Report Describing Flotation Testing on Master Cumpusile No. 1 (RES 2C-2, 3-1 and 3A-1) from the Resolution Project

Comments from each of the six public hearings are available for viewing. Note that the public comment period is now closed.

Public Hearing Comments

Draft EIS

The draft EIS public comment period closed November 7, 2019. All 30,000+ comment submittals are now under review for consideration in the compilation of the final EIS.

Media & General Info

Point of Contact
John Scaggs
Tonto National Forest
john.scaggs@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website