Appendix N

These documents include technical reports, memorandum, scientific journal articles, and others cited in the General Plan of Operations - Volume 3 - Appendix N (GPO). They are available for download as PDF files wherever possible.

The objective of this manual is to provide technical procedures for the estimation of flood discharges for the purposes of designing stormwater drainage facilities and regulating water-courses in Maricopa County.

This report presents the plan of operations level design of a Tailings Storage Facility (TSF) at the Near West site.

This guidance manual describes the process that an Aquifer Protection Permit (APP) applicant should follow in selecting the Best Available Demonstrated Control Technology (BADCT) for a specific mining facility and site in accordance with Arizona Revised Statute (A.R.S) 49-243.B.1.

Comments from each of the six public hearings are available for viewing. Note that the public comment period is now closed.

Public Hearing Comments

Draft EIS

The draft EIS public comment period closed November 7, 2019. All 30,000+ comment submittals are now under review for consideration in the compilation of the final EIS.

Media & General Info

Point of Contact
John Scaggs
Tonto National Forest
john.scaggs@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website