Breadcrumb

  1. Home
  2. Documents
  3. General Plan of Operations
  4. Appendix N

Appendix N

These documents include technical reports, memorandum, scientific journal articles, and others cited in the General Plan of Operations - Volume 3 - Appendix N (GPO). They are available for download as PDF files wherever possible.

The objective of this manual is to provide technical procedures for the estimation of flood discharges for the purposes of designing stormwater drainage facilities and regulating water-courses in Maricopa County.

This report presents the plan of operations level design of a Tailings Storage Facility (TSF) at the Near West site.

Previous Site Selection Study

This guidance manual describes the process that an Aquifer Protection Permit (APP) applicant should follow in selecting the Best Available Demonstrated Control Technology (BADCT) for a specific mining facility and site in accordance with Arizona Revised Statute (A.R.S) 49-243.B.1.