Date Published
May 14, 2020
Summary
This letter is in response to questions posed by BGC Engineering in their March 18, 2020 letter entitled, "Resolution Copper Project EIS - Assessment of Surface Faulting Investigations at the Skunk Camp TSF Location".
Cited In
Reference Information
KCB Consultants. 2020e. Response to March 18, 2020 letter from BGC Re: Resolution Copper Project EIS - Assessment of Surface Faulting Investigations at the Skunk Camp TSF Location. Doc.# CCC.03-81600-EX-LTR-00016 - Rev.0. Phoenix, Arizona: KCB Consultants Ltd. May 14.
*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.