Date Published
May 26, 2020
Summary
The objective of this letter is to address WR-23 and describe and quantify (where possible) the embedded and adaptive contingencies incorporated into the Skunk Camp TSF design and to demonstrate the design robustness to the above uncertainties.
Cited In
Reference Information
KCB Consultants. 2020a. Resolution Copper Project, Skunk Camp Tailings Storage Facility, Response to Action Item WR-23: TSF Storage Contingency. Doc. #CCC.03-81600-EX-LTR-00019 - Rev.0. Phoenix, Arizona: KCB Consultants Ltd. May 26.