Hydrologic test wells HRES-01, HRES-02, HRES-03, HRES-04, and HRES-05 were drilled and constructed during the period February 2 to March 11, 2004. The test wells were drilled evaluate lithologic and hydrogeologic conditions within the Apache Leap Tuff, and were terminated in the uppermost part of the Whitetail Conglomerate. Final test well construction was designed to permit hydrologic testing of the Apache Leap Tuff aquifer, and to provide access for long-term monitoring of groundwater level and groundwater quality for the aquifer. This report was prepared to provide construction details for the wells installed in 2004.
*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.