Date Published
October 26, 2020
Summary
The scope of this memo includes a critical evaluation of the setup, calibration, application and predictions of the M&A (2020a) Skunk Camp TSF groundwater flow and transport model, including the related inputs from the KCB (2020) seepage model.
Cited In
Reference Information
Walser, G. 2020c. Skunk Camp Model Review. Project No.: 1704007-06. Project memorandum. Golden, Colorado: BGC Engineering USA Inc. October 26.
*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.