Breadcrumb

  1. Home
  2. Documents
  3. 2016 Raptor Survey Report Whitlow Ranch Dam, De...

2016 Raptor Survey Report Whitlow Ranch Dam, Devils Canyon, and Mineral Creek, Pinal County, Arizona

Date Published
January 5, 2017
Document Category
Report Category
Summary

Passive survey for raptors in 2016 were conducted at four sites in the vicinity of the Resolution Copper Project. Survey was conducted at the Whitlow Ranch Dam, two portions of Devils Canyon, and one segment of Mineral Creek, all in Pinal County, Arizona. The raptor survey coincided with the 2016 Yellow-billed cuckoo (YBCU) survey, which was also conducted in these areas (WestLand 2016a). The objective of the 2016 raptor survey was to document the presence of raptor species in the vicinity of the Project.

*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.