Breadcrumb

  1. Home
  2. Documents

Documents

The purpose of this process memorandum is to provide consistent time frames for each of the three mine phases—(1) construction, (2) operations, and (3) closure and reclamation—and the overall mine life as described for the proposed action in the “General Plan of Operations” (GPO).

Meeting minutes for Resolution Groundwater Working Group September 12, 2018

Email communication on noise levels produced by blasting operations.

COVER ONLY

This material is protected under copyright law and will not be posted to this website.

COVER ONLY

This material is protected under copyright law and will not be posted to this website.

This study considers a conservative condition to estimate the shear displacement occurring in the faults.

COVER ONLY

This material is protected under copyright law and will not be posted to this website.

Comments received on the DEIS, including those from the U.S. Environmental Protection Agency, questioned the appropriateness of stopping the analysis at these locations and not assessing impacts further downstream, particularly to community water supplies. In response, Section 3.7.2 of the FEIS has been modified to discuss further downstream impacts.

The purpose of our current Project Memorandum is to provide specific responses to those review comments directed to LCI. Specifically, BGC’s comments to LCI pertain to LCI report “Site‐Specific Seismic Hazard Analysis and Development of Time Histories for Resolution Copper’s Proposed Skunk Camp Tailings Storage Facility, Southern Arizona”,

The purpose of this memorandum is to summarize the available information supporting this approach, some considerations in managing pyrite tailings, the available guidance and best practice, other examples of subaqueous tailings disposal, and to generally comment on the applicability for this Project.