Date Published
February 26, 2018
Summary
The purpose of this process memorandum is to provide consistent time frames for each of the three mine phases—(1) construction, (2) operations, and (3) closure and reclamation—and the overall mine life as described for the proposed action in the “General Plan of Operations” (GPO).
Cited In
Reference Information
Rigg, J. 2018. Mine Life Phase Durations. Process memorandum to file. Phoenix, Arizona: SWCA Environmental Consultants. February 26.
*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.