Breadcrumb

  1. Home
  2. Documents
  3. Document Authors
  4. Bill Victor

Bill Victor

This draft technical memorandum has been prepared to summarize results of drilling, construction, and development of groundwater production well RESPW-01. The well was installed to intersect mine workings on the 4400 Mine Level adjacent to Shaft No. 8 of the Magma Mine in order to dewater that level and overlying levels.