Results of Drilling, Construction, and Development of Groundwater Production Well RESPW-01

Date Published
September 14, 2012
Document Category
Report Category
Summary

This draft technical memorandum has been prepared to summarize results of drilling, construction, and development of groundwater production well RESPW-01. The well was installed to intersect mine workings on the 4400 Mine Level adjacent to Shaft No. 8 of the Magma Mine in order to dewater that level and overlying levels.