U.S. Department of Interior

The documents listed below were authored by the U.S. Department of Interior.

This report presents a flood-duration flow frequency analysis for selected durations (1 day, 3 day, 7 day, 15 day, and 30 day) at 173 streamgaging stations throughout Arizona and in western New Mexico.

Flooding is among the worst natural disasters responsible for loss of life and property in Arizona, underscoring the importance of accurate estimation of flood magnitude for proper structural design and floodplain mapping. Twenty-four years of additional peak-flow data have been recorded since the last comprehensive regional flood frequency analysis conducted in Arizona. Periodically, flood frequency estimates and regional regression equations must be revised to maintain the accurate estimation of flood frequency and magnitude.

Draft EIS Released

The Draft Environmental Impact Statement (DEIS) for the Resolution Copper Project and Land Exchange is now available for review under the 'EIS Info' tab.

Draft EIS

Comment on DEIS

Optional ways to comment on the Draft EIS are located under the 'EIS Info' and the 'Public Involvement' tabs.

Comment

Media & General Info

Point of Contact
John Scaggs
Tonto National Forest
john.scaggs@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website