Gannett Fleming

The Skunk Camp TSF was indicated as the preferred alternative in the DEIS, which also included a mitigation measure (FS-227) to complete a “more robust and refined” Failure Mode and Effects Analysis (FMEA) risk assessment “with more refined designs and site-specific information,” to be conducted between the DEIS and the Final EIS to address dam safety comments.

Media Point of Contact

Susan Blake
susan.blake@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website