The Skunk Camp TSF was indicated as the preferred alternative in the DEIS, which also included a mitigation measure (FS-227) to complete a “more robust and refined” Failure Mode and Effects Analysis (FMEA) risk assessment “with more refined designs and site-specific information,” to be conducted between the DEIS and the Final EIS to address dam safety comments.
Gannett Fleming. 2020. Failure Modes and Effects Analysis 2020 Workshop: Resolution Copper Environmental Impact Statement, Proposed Skunk Camp Tailings Storage Facility. Prepared for BGC Engineering. Phoenix, Arizona: Gannett Fleming. October.
*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.