Breadcrumb

  1. Home
  2. Documents
  3. Resolution Copper Mine Pre-Feasibility Study Re...

Resolution Copper Mine Pre-Feasibility Study Refrigeration and Ventilation Strategy

Date Published
November 2012
Summary

In preparing this pre-feasibility documentation, numerous ventilation and refrigeration studies have been carried-out over a period of time with the aim of:

  • Establishing the heat loads and the cooling, ventilation and refrigeration requirements.
  • Providing preliminary ventilation distribution layouts.
  • Identifying suitable refrigeration and ventilation strategies.
  • Providing information on ventilation and refrigeration power requirements.
Cited In

BBE Consulting Morvent Mining. 2012. Resolution Copper Mine Pre-Feasibility Study Refrigeration and Ventilation Strategy. October 2012.

*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.