Date Published
November 1, 2018
Summary
This technical memo summarizes the evaluation of the model construction and approach for the groundwater model used to evaluate future groundwater conditions at and surrounding the proposed Resolution Copper panel cave mine. The groundwater model does not consider impacts from the future tailings facility or water supply pumping over 5 miles distant from the site.
Reference Information
BGC Engineering USA Inc. 2018d. Resolution Copper Project EIS: Review of Numerical Groundwater Model Construction and Approach (Mining and Subsidence Area) - DRAFT. Project No.: 1704005.03. Golden, Colorado: BGC Engineering Inc. November.