This technical memo summarizes the evaluation of the model construction and approach for the groundwater model used to evaluate future groundwater conditions at and surrounding the proposed Resolution Copper panel cave mine. The groundwater model does not consider impacts from the future tailings facility or water supply pumping over 5 miles distant from the site.
BGC Engineering USA Inc. 2018d. Resolution Copper Project EIS: Review of Numerical Groundwater Model Construction and Approach (Mining and Subsidence Area) - DRAFT. Project No.: 1704005.03. Golden, Colorado: BGC Engineering Inc. November.
BGC Engineering USA Inc. 2018d. Resolution Copper Project EIS: Review of Numerical Groundwater Model Construction and Approach (Mining and Subsidence Area) - DRAFT. Project No.: 1704005.03. Golden, Colorado: BGC Engineering Inc. November.
*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.