Peg Leg Pipeline Corridor DEIS Report
The Peg Leg Pipeline Corridor (PLPC) DEIS study considered two potential pipeline corridor alignment options for transport of mill tailings from the West Plant concentrator site to the Peg Leg TSF and return of reclaim water from the Peg Leg TSF back to the West Plant concentrator site.
Golder Associates Inc. 2018b. Peg Leg Pipeline Corridor DEIS Report. Tucson, Arizona: Golders Associates Inc. July 2.
*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.
The final EIS and draft Record of Decision (ROD) presently are scheduled to be published in the Federal Register on January 15, 2021.
Visit Resolution Copper Timeline for more information.
If you would like to receive updates from the Tonto National Forest regarding the Resolution Copper Project and Land Exchange final EIS, sign up for our mailing list.
Forest Service Point of Contact
John Scaggs
Tonto National Forest
john.scaggs@usda.gov
Apache Leap Special Management Area
Apache Leap SMA website