Thumbnail image of document cover: DEIS Design for Alternative 3A Near West Modified Proposed Action (Modified Centerline Embankment - "Wet")

DEIS Design for Alternative 3A Near West Modified Proposed Action (Modified Centerline Embankment - "Wet")

Comments from each of the six public hearings are available for viewing. Note that the public comment period is now closed.

Public Hearing Comments

Draft EIS

The draft EIS public comment period closed November 7, 2019. All 30,000+ comment submittals are now under review for consideration in the compilation of the final EIS.

Media & General Info

Point of Contact
John Scaggs
Tonto National Forest
john.scaggs@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website