Date Published
January 30, 2019
Summary
The seepage estimate appendix (Appendix IV from the Alternative 6 - Skunk Camp DEIS design report) has been amended with the results of the additional seepage control levels and is attached to this letter.
Reference Information
Klohn Crippen Berger Ltd. 2019c. Resolution Copper Project: DEIS Design for Alternative 6 Skunk Camp, Appendix IV Seepage Estimate Amendment. Doc. # CCC.03-81600-EX-REP-0006 Rev.2. Vancouver, Canada: Klohn Crippen Berger Ltd. January 30.