The seepage estimate appendix (Appendix IV from the Alternative 6 - Skunk Camp DEIS design report) has been amended with the results of the additional seepage control levels and is attached to this letter.
Klohn Crippen Berger Ltd. 2019c. Resolution Copper Project: DEIS Design for Alternative 6 Skunk Camp, Appendix IV Seepage Estimate Amendment. Doc. # CCC.03-81600-EX-REP-0006 Rev.2. Vancouver, Canada: Klohn Crippen Berger Ltd. January 30.
Klohn Crippen Berger Ltd. 2019c. Resolution Copper Project: DEIS Design for Alternative 6 Skunk Camp, Appendix IV Seepage Estimate Amendment. Doc. # CCC.03-81600-EX-REP-0006 Rev.2. Vancouver, Canada: Klohn Crippen Berger Ltd. January 30.
*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.