Results of Drilling, Construction, Equipping, and Testing at Hydrologic Test Well DHRES-14
This technical memorandum has been prepared to summarize results of drilling and construction at hydrologic test well DHRES-14. DHRES-14 is located east of Devils Canyon, between the Devils Canyon Fault and JI Ranch Fault. The well was installed to characterize hydrogeologic conditions and provide a monitoring location in the Tertiary Whitetail Conglomerate and Precambrian Pinal Schist. Monitoring data obtained from DHRES-14 will be incorporated into the RCM hydrologic monitoring program.
*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.
The final EIS and draft Record of Decision (ROD) presently are scheduled to be published in the Federal Register on January 15, 2021.
Visit Resolution Copper Timeline for more information.
If you would like to receive updates from the Tonto National Forest regarding the Resolution Copper Project and Land Exchange final EIS, sign up for our mailing list.
Forest Service Point of Contact
John Scaggs
Tonto National Forest
john.scaggs@usda.gov
Apache Leap Special Management Area
Apache Leap SMA website