Documents Cited - General Plan of Operations

Documents cited in the General Plan of Operations document
Three-Point Approximations for Continuous Random Variables

Keefer, D.I. and Bodily, S.E., 1983, Three-point approximations for continuous random variables: Management Science, v. 26, p. 595-609.

PDF icon Download PDF
Low-Volume Roads Engineering Best Management Practices Field Guide

Keller, G and Sherar, J. 2003. Low-Volume Roads Engineering Best Management Practices Field Guide. July 2003.

PDF icon Download PDF
Thumbnail image of Tonto National Forest Land and Resource Management Plan document cover Tonto National Forest Land and Resource Management Plan: Management Indicator Species Status Report

Klein, E., M. Gilbert, S. Lisius, R. Richards, M. Ross, C. Woods, B. Calamusso, D. Pollock, and J. Spencer. 2005. Tonto National Forest Land and Resource...

PDF icon Download PDF
Resolution Project Tailings Characterization: Static Geochemistry

Klohn Crippen Berger (KCB). 2007. Resolution Project Tailings Characterization: Static Geochemistry, Letter Report to Resolution Copper Mining,...

PDF icon Download PDF
Resolution Project 2010 Geotechnical Testing of Tailings Samples

Klohn Crippen Berger. 2011. Resolution Project 2010 Geotechnical Testing of Tailings Samples. January 12, 2011.

PDF icon Download PDF
Resolution Copper Mining Near West Tailings Management Mine Plan of Operations Study

Klohn Crippen Berger. 2014. Resolution Copper Mining Near West Tailings Management Mine Plan of Operations Study. September 2014.

PDF icon Download PDF - Report

Public Hearing Comments Available

Comments from each of the six public hearings are available for viewing. Note that the public comment period is now closed.

Public Hearing Comments

Draft EIS

Media & General Info

Point of Contact
John Scaggs
Tonto National Forest
john.scaggs@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website