Breadcrumb

  1. Home
  2. Documents
  3. Results of Drilling, Construction, and Testing ...

Results of Drilling, Construction, and Testing at Hydrologic Test Wells HRES-21, DHRES-15, and DHRES-16

Date Published
May 12, 2016
Summary

This Technical Memorandum summarizes results of drilling, construction, and testing at hydrologic test wells HRES-21, DHRES-15 and DHRES-16. These wells were drilled to support additional hydrogeologic characterization of the groundwater system in the vicinity of proposed block-cave mining operations currently planned by RCM east of Superior, Arizona.

Cited In
Reference Information

Shelley, M., J. Blainer-Fleming, and T. Keay. 2016. Results of Drilling, Construction, and Testing at Hydrologic Test Wells HRES-21, DHRES-15, and DHRES-16. Project #: 605.3201. Technical memorandum. Tucson, Arizona: Montgomery and Associates Inc. May 12.

*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.