Draft Reclamation Plan: Preferred Alternative

Date Published
June 2020
Authors
Summary

This Reclamation Plan has been prepared as per DEIS mitigation measure FS-226 to outline the reclamation and closure measures and establish the basis for the reclamation cost estimate and financial assurance. It is designed to return land disturbed by Resolution Copper’s mining activities to a near natural condition and ensure the site does not pose any long-term risk to the people or surrounding environment.

Cited In
Reference Information

Tetra Tech. 2020. Draft Reclamation Plan: Preferred Alternative. #114-570991. Prepared for Resolution Copper. Missoula, Montana: Tetra Tech Inc. June.