Date Published
June 2019
Document Category
Summary
A variation of the proposed action described in the May 9, 2016, version of Resolution Copper’s General Plan of Operations, this alternative would include a split-stream tailings processing method with two tailings types.
Other Alternative Snapshot Documents:
- Alternative 2: Near West Proposed Action
- Alternative 3: Near West Ultrathickened
- Alternative 4: Silver King
- Alternative 5: Peg Leg
- Alternative 6: Skunk Camp - North Option
*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.