Breadcrumb

  1. Home
  2. Documents

Documents

COVER ONLY

Materials that meet the criteria of Freedom of Information Act exemptions are not posted on this website. Culturally sensitive materials not posted here fall under this criteria.

This technical memorandum summarizes the results from a 100-year (2022-2121) model projection for the Phoenix AMA.

Many information sources were used to develop this issue of the Arroyo, which summarizes Arizona's current water situation, future challenges, and options for closing the looming water demand-supply gap.

The first numerical groundwater flow model of the Pinal AMA was developed by the Arizona Department of Water Resources (ADWR) in 1990. This report documents an extensive update of the 1990 model.

Please see the attached responses to Groundwater Modeling Workgroup action items GW-75, GW- 76, GW-77, GW80 and GW-81 for your review and consideration.

Pinto Valley Mining Corp. submitted a mining plan of operations proposing to expand mining operations onto National Forest System lands to access mineralization that extends onto claims on National Forest System lands, to extend the mine life for approximately 19 years, to address existing Open Pit slope instability in the southeastern portion of the pit, and to consolidate prior authorizations that are reasonably incident to extraction, transportation, and processing of mineral deposits.

The purpose of this investigation was to assess the Property and surrounding areas to identify the presence or potential presence of recognized environmental conditions (RECs) potentially resulting in environmental impacts to the Property.

Soil properties are measured or inferred from direct observations in the field or laboratory. Examples of soil properties are particle-size distribution, cation-exchange capacity, and salinity.

The January 2021 Rescinded draft ROD explains the Tonto National Forest’s rationale and documents the Tonto’s proposed decision to authorize uses of National Forest System land by issuing a road use permit and special use authorizations for pipeline and power line corridors associated with the project.

Abstracts below provide information on taxonomy, identification and description, biology, distribution, population trends, management, photos and illustrations and references as available for each special status species.