This tech memo presents the first update of the Groundwater Assessment prepared by Golder Associates on behalf of Resolution Copper Mining.  This work is required as part of the Area-Wide Aquifer Protection Permit for the West Plant Site.  Specifically, this tech memo partially fulfills APP Compliance Schedule Item (CSI) No. 2.

This report summarizes the meteorological, nitrogen dioxide (NO2), sulfur dioxide (SO2), ozone (O3), and particulate matter (PM) data collected at the Resolution Copper Project near Superior, Arizona for the fourth quarter, October 1-December 31, 2013.

The purpose of the Phase I assessment was to conduct non-invasive field investigations to supplement information obtained previously from published data and to plan Phase III investigations involving subsurface exploration drilling and hydrologic testing.

Bird surveys were conducted in the vicinity or RCM's holdings near Superior, Arizona. This report provides an inventory of the birds observed during 2009, various analyses of the data by habitat type, and where appropriate, comparisons to similar data collected in 2008.

Raptor studies were conducted within the proposed Near West Tailings alternative area to provide baseline biological information to support planning and permitting activities.

This technical memorandum has been prepared to summarize the results of drilling, construction, and testing at hydrologic test wells HRES-14 and HRES-15. The wells were installed to characterize hydrogeologic conditions in the Apache Leap Tuff on the east side of Devils Canyon, near the Devils Canyon Fault. Monitoring data obtained from HRES-14 and HRES-15 have been incorporated into the RCM hydrologic monitoring program.

Arizona hedgehog cactus survey was conducted along areas proposed for pre-feasibility activities.

This Phase I Environmental Site Assessment (ESA) is for approximately 147 acres referred to as Turkey Creek, also known as the JX Bar Ranch and J Slash X Ranch.

This report presents a flood-duration flow frequency analysis for selected durations (1 day, 3 day, 7 day, 15 day, and 30 day) at 173 streamgaging stations throughout Arizona and in western New Mexico.

This Modeling Report includes a description of the methods and datasets used in the air quality modeling analyses to estimate the Resolution Project’s air quality impacts relative to the applicable Ambient Air Quality Standards (AAQS) for criteria pollutants and to Air Quality Related Values (AQRV) in the near-field domain and in several Class I Wilderness Areas in the far-field domain.