Breadcrumb

  1. Home
  2. Documents

Documents

The purpose of this process memorandum is to provide the background and summary of the total direct and indirect emissions of greenhouse gases (GHG) associated with the proposed action for the Resolution Copper Mine (RCM) Development near Superior, Arizona.

COVER ONLY

This material is protected under copyright law and will not be posted to this website.

The management plans serve as a tool to assist the Arizona Department of Water Resources in achieving the groundwater goals of each of the state's five Active Management Areas.

This plan contains the conservation programs that are intended to guide the Phoenix AMA to meet it management goal - and these conservation programs are to be designed to achieve reductions in groundwater withdrawals.

The process of updating the Pinal model geology was begun in 2007, and had not been addressed since Modeling Report No. 2 (Corkhill and Hill, 1990). The purpose of this provisional report is to document the data collection activities and findings of the hydrogeologic framework of the study area. This report will be finalized after the Pinal Active Management Area (AMA) Regional Groundwater Flow Model report which documents the update and recalibration of the groundwater flow model in Pinal County have been completed.

COVER ONLY

Materials that meet the criteria of Freedom of Information Act exemptions are not posted on this website. Culturally sensitive materials not posted here fall under this criteria.

The purpose of this process memorandum is to address several measures related to wildlife that are included as required mitigation in appendix J of the final environmental impact statement.

The Scenery Management System presents a vocabulary for managing scenery and a systematic approach for determining the relative value and importance of scenery in a national forest.

The purpose of this investigation was to assess the Property and surrounding areas to identify the presence or potential presence of recognized environmental conditions (RECs) potentially resulting in environmental impacts to the Property.

This report presents the results of sitespecific probabilistic seismic hazard analyses (PSHA) and deterministic seismic hazard analyses (DSHA) of four sites for the RMC tailings storage facilities options in southern Arizona.