Breadcrumb

  1. Home
  2. Documents

Documents

This Addendum to the Original TIA (TIA Addendum) also further explores possible mitigation measures and evaluate crash rates at the intersections of N Smeltertown Road/Main Street, Silver King Mine Road/US 60 and Main Street/US 60.

Response to Water Work Group Action Item #WR-20 (Provide input on potential for stormwater release and estimate of quality)

This memo will focus directly on answering this question and provide graphical output from the predictive model to demonstrate the hydraulic containment of the groundwater through the years after mine closure.

Meeting minutes for Resolution Water Working Group June 25, 2020

This memorandum is intended to provide BGC’s third party evaluation and expert opinion on each of the issues raised by Malach, through a review of Malach’s report and cited references and based on data and reports from RCM and their consultants, and discussions within the Workgroup.

COVER ONLY

This material is protected under copyright law and will not be posted to this website.

This report summarizes the Groundwater Modeling Workgroup evaluation of the model construction and approach for the groundwater model used to evaluate future groundwater conditions at and surrounding the proposed Resolution Copper panel cave mine.

COVER ONLY

This material is protected under copyright law and will not be posted to this website.

The alternatives development process was last documented for the public in a Draft Final Alternatives Evaluation Report in November 2017. The purpose of this process memorandum is to document key process steps occurring since November 2017 that have resulted in a revised range of alternatives to be considered for detailed analysis in the DEIS.