In response to USFS document titled "List of Potential Final EIS Changes Prior to Republication", which states: "Resolution Copper ownership of Gov't Springs and parcels in Dripping Springs Wash", please find copies of Resolution Copper special warranty deeds for the parcels collectively referred to as Government Springs.
Five-Year Probabilistic Projections of future conditions in the Colorado River system currently extend through 2027. They are typically updated every January, April, and August, while probabilistic results for the 2-year period are updated every month. The 5-Year Probabilistic Projections are generated using the Colorado River Mid-Term Modeling System (CRMMS) in Ensemble Mode.
The following two new species of land snails were taken on a collecting trip in Arizona during October 1949 by M. L. Walton and the author. They belong to the families Camaenidae and Polygyridae, respectively.
An extraordinary drought in the West in drying up the Colorado River and draining the nation's largest reservoirs - Lake Mead and Lake Powell. And amid the overuse of the river and the aridification of the region, the federal government is implementing new mandatory water cuts and asking states to devise a plan to save the water basin.
This updated memo quantifies Resolution’s estimated Scope 2 (indirect) GHG emissions associated with Resolution’s annual electricity use and accounts for the following GHGs: CO2, methane (CH4), and nitrous oxide (N2O).
This land and resource management plan (referred to as the forest plan throughout this document) guides the Tonto National Forest in fulfilling its stewardship responsibilities to best meet the current and future needs of the people and communities we serve.
The purpose of this process memorandum is to provide a consistent acreage, broken down by project component or facility, alternative, and ownership (private, state, federal).
Meteorological and air quality monitoring program to support several efforts during the mine development phases: environmental assessments, impact analyses, and documents required by NEPA; meteorological and air quality data to be processed and used as input for AERMOD dispersion modeling; and air quality baseline data and AERMOD analyses in support of an application to the Pinal County Air Quality Control District for air permits.
This report summarizes meteorological measurements collected at the Resolution Copper Mine monitoring system. The purpose of the monitoring program is to provide the measurements necessary to establish existing meteorological conditions at the proposed site of the Resolution Mine in support of a future air quality permit application.
In February 2010, Montgomery published a report entitled "Interim Results of Groundwater Monitoring, Upper Queen Creek and Devils Canyon Watersheds" (M&A 2010) which reported all hydrochemical and isotopic data available through the second quarter of 2009. The current report presents hydrochemical and isotopic data collected since M&A 2010 was published.