Breadcrumb

  1. Home
  2. Documents

Documents

Meeting minutes for Resolution Water Working Group June 25, 2020

This memorandum is intended to provide BGC’s third party evaluation and expert opinion on each of the issues raised by Malach, through a review of Malach’s report and cited references and based on data and reports from RCM and their consultants, and discussions within the Workgroup.

COVER ONLY

This material is protected under copyright law and will not be posted to this website.

This report summarizes the Groundwater Modeling Workgroup evaluation of the model construction and approach for the groundwater model used to evaluate future groundwater conditions at and surrounding the proposed Resolution Copper panel cave mine.

COVER ONLY

This material is protected under copyright law and will not be posted to this website.

The purpose of this process memorandum is to detail the process steps undertaken during the alternatives development process, related to evaluation of alternative mining techniques.

Cultural resources assessment for the proposed trenching within the Gila River streambed at Managed Aquifer Recharge (MAR) Site 5 in District 3 of the GRIC, Pinal County, Arizona.

At the public hearings held during the comment period for the DEIS, commenters expressed concern over potential schedule delays and technical complications with the block cave mining technique proposed for use in the underground operation at the Oyu Tolgoi mine.

The purpose of this process memorandum is to outline the methods and screening results used for the analysis of cumulative effects for the Resolution Copper Project and Land Exchange environmental impact statement (EIS).

Related Documents

This study uses simulation-based life cycle assessment (LCA) together with a commercial flowsheet simulation program to compare several copper smelting technologies against each other when producing metallic blister copper from sulfide copper ore.