The purpose of this process memorandum is to summarize the additional data received after the publication of the Draft EIS.

COVER ONLY

This material is protected under copyright law and will not be posted to this website.

Subsidence at the Resolution Copper (RC) project is predicted to occur in a typical slow and gradual process from approximately year 6 when the cave from the underground mining is expected to reach surface.

The purpose of this memo is to provide detailed rationale for the determinations expressed regarding a document purported to be the technical analysis demonstrating the financial feasibility of cut-and-fill mining.

The Gila River MAR 5 Interpretive Trail is an outdoor educational living experience that will enlighten our visitors about our farming legacy.

The purpose of this process memorandum is to document the process used by the NEPA interdisciplinary team to identify and consider reasonably foreseeable future actions for inclusion in the cumulative effects analysis of the Resolution Copper Project final EIS.

This document outlines the access and management plan for the campground once transfer of ownership is complete.

R3-4-245. Noxious Weeds. Definitions including "Class A Noxious Weed", "Class B Noxious Weed", "Class C Noxious Weed" and list with common and scientific names.

Carrichtera annua (Ward's weed) is an annual herb (family Brassicaceae) with white to yellow flowers and hairy lobed leaves found in the south coast ranges of California.

An energy system powered by clean energy technologies differs profoundly from one fuelled by traditional hydrocarbon resources. Building solar photovoltaic (PV) plants, wind farms and electric vehicles (EVs) generally requires more minerals than their fossil fuel- based counterparts. A typical electric car requires six times the mineral inputs of a conventional car, and an onshore wind plant requires nine times more mineral resources than a gas-fired power plant.