The purpose of this process memorandum is to provide a summary of the geographic information system (GIS) spring coverage that SWCA created for the Resolution Copper Project (Resolution).
The overall purpose of this study is to investigate the potential geomorphic impacts to Dripping Spring Wash downstream from the Skunk Camp TSF project.
The proposed Resolution Mine presents a number of socioeconomic issues which required research, analysis and modeling. This report provides greater detail and documentation regarding the socioeconomic effects summarized in the Final EIS.