Date Published
              May 15, 2020
          Summary
              This Pipeline Protection and Integrity Plan outlines the potential failure modes and design considerations and environmental and spill control measures for pipeline construction and operation.
Reference Information
              Golder Associates Inc. 2020. Resolution Copper Skunk Camp Pipelines: Pipeline Protection and Integrity Plan. CCC.03-81900-EP-REP-00007_Rev0. Walnut Creek, California: Golder Associates Inc. May 15.
