Breadcrumb

  1. Home
  2. Documents
  3. Baseline Reports

Baseline Reports

The documents listed below represent baseline information collected by Resolution Copper and provided to the Tonto National Forest to be used as a partial basis for the analysis in the EIS. The Tonto National Forest will independently evaluate any data provided by Resolution Copper that is used in the EIS to ensure that it is valid, adequate to support the analysis, and represents the best available science.

Arizona hedgehog cactus surveys were conducted within the Resolution Pre-Feasibility Activities area in conformance with the monitoring required by the Resolution Copper Mining Pre-feasibility Activities Plan of Operations EA and the Forest Service's Biological Assessment and Evaluation.

This report summarizes meteorological measurements collected at the Resolution Copper Mine monitoring system. The purpose of the monitoring program is to provide the measurements necessary to establish existing meteorological conditions at the proposed site of the Resolution Mine in support of a future air quality permit application.

Bird surveys were conducted in the vicinity or RCM's holdings near Superior, Arizona. This report provides an inventory of the birds observed during 2009, various analyses of the data by habitat type, and where appropriate, comparisons to similar data collected in 2008.

This report summarizes meteorological measurements collected at the Resolution Copper Mine monitoring system. The purpose of the monitoring program is to provide the measurements necessary to establish existing meteorological conditions at the proposed site of the Resolution Mine in support of a future air quality permit application.

This report summarizes meteorological measurements collected at the Resolution Copper Mine monitoring system. The purpose of the monitoring program is to provide the measurements necessary to establish existing meteorological conditions at the proposed site of the Resolution Mine in support of a future air quality permit application.

This technical memorandum was prepared to document results and analysis of a 60-day pumping test conducted at hydrologic test well HRES-07.

This report summarizes meteorological measurements collected at the Resolution Copper Mine monitoring system.  The purpose of the monitoring program is to provide the measurements necessary to establish existing meteorological conditions at the proposed site of the Resolution Mine in support of a future air quality permit application for the facility.

Groundwater monitoring in the upper Queen Creek and Devils Canyon watersheds was initiated by RCM in early 2004.  The current RCM groundwater monitoring program includes 19 wells, boreholes or shafts.  Based on results of hydrogeological characterization studies conducted to date, three principal aquifers have been identified.  The purpose of the groundwater monitoring program is to provide hydrologic data for continued development and refinement of the conceptual hydrogeologic model for the ALT aquifer and adjacent aquifers in the study area that might be impacted by block-c

This technical memorandum was prepared to provide an interim summary of data collected at wells DHRES-01 and DHRES-02. Deep hydrogeologic test wells DHRES-01 and DHRES-02 were drilled and constructed during the period May 2 to September 10, 2008. In order to measure hydraulic heads at specific elevations in the Apache Leap Tuff (Tal) and Whitetail Conglomerate (Tw), vibrating-wire pressure transducers were grouted in the annulus between the borehole wall and conductor casing at wells DHRES-01 and DHRES-02.

The Audubon IBA bird survey data collection coordinated by the Tucson Audubon-IBA Program, Avian Science Initiative, at 7B Ranch provided key "mesquite bosque avian habitat" data for these reviews.