Breadcrumb

  1. Home
  2. Documents
  3. Baseline Reports

Baseline Reports

The documents listed below represent baseline information collected by Resolution Copper and provided to the Tonto National Forest to be used as a partial basis for the analysis in the EIS. The Tonto National Forest will independently evaluate any data provided by Resolution Copper that is used in the EIS to ensure that it is valid, adequate to support the analysis, and represents the best available science.

Resolution Copper has collected meteorological and air quality data to support several efforts during the pre-feasibility and other mine development phases for the Resolution Copper project.  This report characterizes baseline air quality and meteorological conditions for the project site and the nearby region.

This report summarizes meteorological measurements collected at the Resolution Copper Mine monitoring system. The purpose of the monitoring program is to provide the measurements necessary to establish existing meteorological conditions at the proposed site of the Resolution Mine in support of a future air quality permit application.

This plan describes the procedures followed by RCM for the WPS activities to prevent, control, and mitigate releases of oil and petroleum products to the environment at its RCM WPS located near the Town of Superior, in Pinal County, Arizona.

A raptor survey was conducted on the approximately 1,224-hectare Federal Parcel, in the Tonto National Forest. The purpose of this survey was to determine which raptor species could be confirmed on the Parcel.

This is a summary of personal observations and impressions of the continued presence or absence of the herpetofauna which have been previously reported at the Appleton-Whittell Research Ranch. A total of fifty-two amphibian and reptile species have been reported within the Research Ranch boundaries. The continued existence of several species may be in doubt.

This technical memorandum was prepared to provide an interim summary of data collected at wells DHRES-01 and DHRES-02. Deep hydrogeologic test wells DHRES-01 and DHRES-02 were drilled and constructed during the period May 2 to September 10, 2008. In order to measure hydraulic heads at specific elevations in the Apache Leap Tuff (Tal) and Whitetail Conglomerate (Tw), vibrating-wire pressure transducers were grouted in the annulus between the borehole wall and conductor casing at wells DHRES-01 and DHRES-02.

This technical memorandum was prepared to document results and analysis of a 90-day aquifer test conducted by RCM at well HRES-20 completed in the Apache Leap Tuff (ALT) aquifer.

This report summarizes the meteorological, upper air, nitrogen dioxide (NO2), sulfur dioxide (SO2), ozone (O3), and particulate matter (PM) data collected at the Resolution Copper Project near Superior, Arizona for the third quarter, July 1 – September 30, 2015.

The purpose of this traffic study is to evaluate the current and future transportation system at the proposed Resolution Copper Mine expansion without and with the project. Traffic operations were analyzed at existing, key intersections located near the proposed mining operations and facilities during construction and final operations. Revised April 13, 2017.

This biological evaluation (BE) supports an evaluation of an alternative tailings storage facility (TSF; the Project) located southeast of Superior and north of Kearny, Pinal County, Arizona. The purpose of this BE is to perform a screening analysis to determine the occurrence or potential to occur of special-status species and/or designated or proposed critical habitat in the proposed Project Area or its vicinity.