The documents listed below represent baseline information collected by Resolution Copper and provided to the Tonto National Forest to be used as a partial basis for the analysis in the EIS. The Tonto National Forest will independently evaluate any data provided by Resolution Copper that is used in the EIS to ensure that it is valid, adequate to support the analysis, and represents the best available science.

This report summarizes meteorological measurements collected at the Resolution Copper Mine monitoring system.  The purpose of the monitoring program is to provide the measurements necessary to establish existing meteorological conditions at the proposed site of the Resolution Mine in support of a future air quality permit application for the facility.

This report summarizes meteorological measurements collected at the Resolution Copper Mine monitoring system. The purpose of the monitoring program is to provide the measurements necessary to establish existing meteorological conditions at the proposed site of the Resolution Mine in support of a future air quality permit application.

The goals of the baseline surface water monitoring program are to: a) Refine understanding of surface water  occurrence, quantity, and quality within the study are b) Develop a baseline data set against which future potential impacts from mining may be measured, and c) Support development of an EIS.

This report summarizes the biological resources of one parcel of U.S. Forest Service land (the Federal Parcel) and five privately owned parcels (the Offered Lands). The work was conducted in anticipation of a possible land exchange.

Baseline biological studies in the Resolution Project Area. Surveys reported here focus specifically on aquatic habitats in Mineral Creek, Devils Canyon, and two tributaries to Devils Canyon, Ranch Rio and Hackberry Creeks.

Resolution Copper Mining LLC (RCML) intends to implement a meteorological and air quality monitoring program to support several efforts during the pre-feasibility and other mine development phases.

This technical memorandum was prepared to summarize modifications made to wells HRES-02, HRES-05, and HRES-10 in 2011.

The purpose of this traffic study is to evaluate the current and future transportation system at the proposed Resolution Copper Mine expansion without and with the project. Traffic operations were analyzed at existing, key intersections located near the proposed mining operations and facilities during construction and final operations.

This report summarizes the meteorological, upper-air (SoDAR), nitrogen dioxide (NO2), sulfur dioxide (SO2), ozone (O3), and particulate matter (PM) data collected at the Resolution Copper Project near Superior, Arizona, for the fourth quarter, October 1 through December 31, 2016.

Surveys were conducted for special-status plant species associated with water features that occur in the vicinity of the Study Area.