Breadcrumb

  1. Home
  2. Documents
  3. References - Final EIS

References - Final EIS

The following documents were cited the Final EIS:

The scope of this Master Water Plan will detail the water infrastructure needed to serve the Auction Property and will provide a regional framework for the anticipated infrastructure needed for the surrounding area around Development Units 1 & 2 totaling approximately 5,307 acres (Retained Property).

The federal government on Monday declared a water shortage on the Colorado River for the first time, triggering mandatory water consumption cuts for states in the Southwest, as climate change-fueled drought pushes the level in Lake Mead to unprecedented lows.

COVER ONLY

Materials that meet the criteria of Freedom of Information Act exemptions are not posted on this website. Culturally sensitive materials not posted here fall under this criteria.

The objective of this plan is to support the site-wide reclamation plan (Tetra Tech 2020) by providing the strategy and design for implementing closure measures for the Skunk Camp TSF.

We, the U.S. Fish and Wildlife Service (Service), designate critical habitat for the northern Mexican gartersnake (Thamnophis eques megalops) under the Endangered Species Act of 1973 (Act), as amended.

We, the U.S. Fish and Wildlife Service (Service), designate critical habitat for the western distinct population segment of the yellow-billed cuckoo under the Endangered Species Act.

Pinto Valley Mining Corp. submitted a mining plan of operations proposing to expand mining operations onto National Forest System lands to access mineralization that extends onto claims on National Forest System lands, to extend the mine life for approximately 19 years, to address existing Open Pit slope instability in the southeastern portion of the pit, and to consolidate prior authorizations that are reasonably incident to extraction, transportation, and processing of mineral deposits.

Curious about how the CAP Priority System works? Here's your explainer.

COVER ONLY

Materials that meet the criteria of Freedom of Information Act exemptions are not posted on this website. Culturally sensitive materials not posted here fall under this criteria.

At six volumes, the January 2021 Rescinded final Environmental Impact Statement (FEIS) describes the potential environmental effects from two proposed actions: a general plan of operations for development of a large-scale underground copper mine by Resolution Copper Mining, LLC.A related, and a legislatively-mandated land exchange.