Chris Garrett

Minutes for meeting with goals to review results of modeling conducted by RCM for the Desert Wellfield pumping in the East Salt River Valley and discuss permitting pathway.

The purpose of this process memorandum is to document information received from Resolution Copper regarding the variation in the lithology of mined material over the mine life.

The purpose of this process memorandum is to provide an addendum to a process memo dated October 18, 2016 titled “Summary of Hydrologic, Hydrochemical, and Geochemical Data Received to Date”.

The purpose of this process memorandum is to provide a history of the revisions made to the General Plan of Operations (GPO) submitted by Resolution Copper Mining, LLC (Resolution) for consideration by the Tonto National Forest.

Pages

Comments from each of the six public hearings are available for viewing. Note that the public comment period is now closed.

Public Hearing Comments

Draft EIS

The draft EIS public comment period closed November 7, 2019. All 30,000+ comment submittals are now under review for consideration in the compilation of the final EIS.

Media & General Info

Point of Contact
John Scaggs
Tonto National Forest
john.scaggs@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website