WSP Parsons Brinckerhoff

The regional numerical groundwater model constructed for the Resolution Copper (RC) project is described in detail in this report.

This technical memorandum presents the results of the sensitivity analysis completed for the Resolution Copper (RC) groundwater flow model developed by WSP in support of the EIS for the Resolution Copper Mine plan and land exchange.

This technical memorandum presents the predictive results from the Resolution Copper (RC) groundwater flow model developed by WSP in support of the EIS for the Resolution Copper Mine plan and land exchange.

This technical memorandum presents predictive results from the Resolution Copper (RC) groundwater flow model developed by WSP in support of the EIS for the Resolution Copper Mine plan and land exchange.

The purpose of this study is to quantify climbing resources and to assess potential losses for the Environmental Impact Statement (EIS) and to help identify needs for potential mitigation. Aside from a climbing resources inventory, this memorandum also provides background information related to climbing resources, including a description of areas within the Queen Creek climbing area.

Comments from each of the six public hearings are available for viewing. Note that the public comment period is now closed.

Public Hearing Comments

Draft EIS

The draft EIS public comment period closed November 7, 2019. All 30,000+ comment submittals are now under review for consideration in the compilation of the final EIS.

Media & General Info

Point of Contact
John Scaggs
Tonto National Forest
john.scaggs@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website